Verona, Italy · Two-bedroom
In the heart of Verona, inside the historic palace linked to the Montecchi family, a two-bedroom apartment within the luxury hospitality project Casa Museo Romeo has been fully renovated to offer an exclusive stay. Its spacious, bright interiors and contemporary finishes with herringbone parquet, light boiserie and a warm material palette, create a harmonious dialogue with the building's historic heritage. Artwork selected by the owner completes the atmosphere, turning the apartment into an elegant cultural experience. A refined stay, curated in every detail.
Drag to see before and after
The half-height boiserie on the walls and the herringbone floor were chosen together, to give the apartment a French note — a room that reads as considered rather than merely restored.
The owner is an art collector, and chose the works hung throughout the apartment himself: guests stay inside the collection rather than beside it, closer to a museum than to a rented room.










Project plan
Next project
Casa Museo Romeo — the one-bedroom